How long does planning permission take in Edinburgh?

How long does planning permission take in Edinburgh?

Planning authorities aim to reach a decision within 4 months of receiving a valid application for major developments and 2 months for local developments. Find more information on how the planning system works on the Scottish Government website.

How do I check planning permission in Scotland?

If you want to find a planning appeal or an appeal decision, you can find it on the Planning and Environmental Appeals Division (DPEA) website. Its case publication section gives information on all the cases that DPEA have received since 1 September 2002.

Does Edinburgh require planning permission?

Do I need Permission? Not all extensions or alterations require planning permission. Many small alterations and extensions can be carried out without the need for planning permission – this is known as Permitted Development (PD) and some alterations may not even be ‘development’ at all.

Are planning objections anonymous?

Please note that any correspondence received in relation to a planning application can be viewed by the public, including the applicant. We display letters of representation on our website (with signatures, email address and phone numbers redacted). We are unable to consider anonymous objections.

How big an extension can I build without planning permission in Scotland?

If your extension will have one storey, you don’t need planning permission as long as:

  • it’s located at the back of the house.
  • it doesn’t go back further than 3 metres if it’s a terraced house, or 4 metres if it isn’t.
  • the height of the eaves (where the wall meets the roof) is no higher than 3 metres.

How much does it cost to get planning permission in Scotland?

The cost for an outline planning permission is £460 for each 0.1 hectare of an, and £230 for a householder application. In Scotland, both a full permission application on a new house and an outline application costs £401 while a householder application is £202.

What size of garage can I build without planning permission Scotland?

Do I Need Planning Permission for a Garage in Scotland? The garage should be at the rear of the dwelling (not forward of the front wall of the house). The height of the garage is not higher than 4 metres. Any part of the garage within 1 metre of the boundary cannot be higher than 2.5 metres.

What happens if you build something without planning permission?

If you build without planning permission, you may not be breaking any rules. However, if there is a planning breach, you may have to submit a retrospective application or even appeal against an enforcement notice.

What is the city of Edinburgh Council planning collection?

Collection of documents from City of Edinburgh Council planning authority that are submitted frequently as part of the planning process. To submit materials to be considered as part of this collection, email them to [email protected].

How do I submit to the planning Edinburgh service?

Sign up to the Planning Edinburgh blog for the latest updates on our service. At this time we are only supporting online submissions via the eDevelopment portal, which includes a simple to use online card payment option.

What is ASL health care planning for Edinburgh?

ASL health care planning – The City of Edinburgh Council ASL health care planning Documents to support planning to meet additional support needs. Handbook of procedures for the management of pupils with health care needs in educational establishments

How do I submit a document to the eplanning system?

Planning authorities can make submissions using the eplanning document exchange system. To submit a document on this list as part of your document list, you must hyperlink the document name with the URL for the document.