Do you need a permit for a shed in Lee County Florida?
A Residential Accessory Stucture permit is required for decks and sheds. All residential permit applications require a state-licensed contractor, who is also registered with Lee County, or an Owner Builder Declaration of Self-Use.
What size shed can I build without a permit in Florida?
Per the Florida Building Code, sheds 200 square feet or less and used exclusively for storage purposes are exempt from permitting requirements.
How close to property line can I build a shed in Florida?
five (5)
Sheds must be located a minimum of five (5) feet from all property lines. Lawn storage shed permits will only be issued for properties where an existing residential structure is present. Lawn storage sheds may not be placed in the front yard area but may be located in the rear or side yard areas.
How close to property line can I build a fence in Lee County Florida?
Fences made of barbed wire, spire tips or sharp objects or that are electrified shall not be erected within 100 feet of any residential area or residential zoning district without the Director’s authorization and review of hazards.
Do I need a permit to build a fence in Lee County Florida?
Do I need a permit to install a fence? Yes.
Do I need a permit for an above ground pool in Lee County Florida?
A Residential Pool permit (private swimming pool) is required for construction or renovation of all in- ground pools and for above-ground pools with water depths of 24 or more inches intended for swimming or recreation.
How close to fence can you build a shed?
You typically can’t build a shed within 10 feet of the rear property line and 15 feet from a side property line. There should be sufficient room between your shed and your neighbor’s yard. If there is any question, review your permit, check with your HOA, or contact your municipality office.
Do I need a permit to clear my land in Lee County Florida?
A permit is required for the removal of native vegetation and trees in accordance with the Tree Protection section of the Lee County Land Development Code (Chapter 14). The Different Areas of Vegetation Removal: for agricultural clearing purposes – Notice of Clearing