What is a pre-startup safety review?

What is a pre-startup safety review?

One of the fundamental tools for managing change is the Pre-Startup Safety Review (PSSR). A PSSR consists of a checklist of items to be thoroughly verified before a process begins or restarts in order to ensure that potential hazards have been properly addressed.

What is a Pssr document?

Pre-Startup Safety Review (PSSR) – a technical review and inspection of equipment modification prior to startup to ensure that the modification has been installed in accordance with the approved design standards, that procedures are in place and adequate, and that training of affected personnel has been completed.

What does Pssr stand for in construction?

A pre-startup safety review (PSSR) is a crucial part of any process safety management program (PSM), and it is the final step to ensure safety and efficacy before bringing an updated or new process online.

What is the purpose of a pre start up inspection?

A PSSR inspection allows you to thoroughly review the status of employee training, construction, equipment, and other components involved in a company change. This PSSR checklist will help ensure that your employees are kept safe during Management of Change (MOC).

Which circumstance would require a pre start health and safety review PSSR )?

Section 7 of Regulation 851 requires that a pre-start health and safety review be carried out in factories on certain machinery, protective elements, structures, and processes that can pose a serious hazard to worker health and safety, before they are operated for the first time or before modifications are made.

What is the importance of Pssr?

The PSSR is a safety review conducted prior to startup (commissioning) of a new or modified processing/manufacturing plant or facility to ensure that installations meet the original design or operating intent, to catch and re-assess any potential hazard due to changes during the detailed engineering and construction …

How is Pssr conducted?

Coordinate PSSR participation from knowledgeable Contractor and Owner personnel. Conduct Technical and HSE reviews of documentation and on site. Verify all construction and equipment is in accordance with safety, environmental and health regulation and standards. Complete all corrective action items raised in the PSSR.

What Pssr covers?

The Pressure Systems Safety Regulations 2000 (PSSR) cover the safe design and use of pressure systems. The aim of PSSR is to prevent serious injury from the hazard of stored energy (pressure) as a result of the failure of a pressure system or one of its component parts.

What are the four steps in a pre start check?

Terms in this set (7)

  1. Check the surroundings of the car >>> tire pressure, wheel direction and cars around you.
  2. Get in the car and close the door.
  3. Put the key in the ignition.
  4. Adjust your seat.
  5. Adjust all the mirrors.
  6. Put seat belt on.
  7. Start the car.

What is a pre start checklist?

In the most basic sense, a pre start checklist is an organised list of parts and pieces of equipment that need to be carefully checked prior to use. This document ensures the capacity of the equipment deemed to function well and is safe prior to use by workers.

What triggers a PSR?

Regulation 851 currently requires a PSR when a process uses or produces a substance that may result in the exposure of a worker in excess of any exposure limit set out in Regulation 833 (Control of Exposure to Biological or Chemical Agents), Ontario Regulation 278/05 (Designated Substance — Asbestos on Construction …

What is a Pre-Startup Safety Review?

A pre-startup safety review (PSSR) is carried out to confirm that all appropriate elements of process safety management have been addressed satisfactorily and that the facility is safe to startup.

Should a PSSR be done before or after startup?

If answer to any of the checklist items is “no”, an action needs to be created for completion before or after startup. 4. For temporary changes, a PSSR should be done before the change and again after restoration of the facility to its original state. 5. The PSSR team is not expected to review the plant design or process hazards reviews.

What is a pre-commission Safety Review (PSSR)?

The PSSR is a safety review conducted prior to startup (commissioning) of a new or modified processing/manufacturing plant or facility to ensure that installations meet the original design or operating intent, to catch and re-assess any potential hazard due to changes during the detailed engineering and construction phase of a project.

What is the pre-startup of a hazardous chemical inventory?

The pre-startup review confirms that before the introduction of a modified chemical or a modification to the current hazardous chemical inventory: Safety, maintenance, operating, and emergency procedures are in their proper place and correct;